Fencing Closed and guarded area. Fencing, entrance gate and wickets made with galvanised steel, fencing height from 1.0 up to 1.7 m
Pedestrian accesses, access Made of concrete paving blocks in grey
Small architecture Benches, lamps, plant pots (system pots)
Greenery on virgin soil Carpet lawns, bushes and trees according to the greenery design
Greenery on floor-ceilings Lawns, cover plants, greenery in plant pots - according to the greenery design
Water supply and sewerage system System for watering of greenery, storm water sewerage
Wiring systems Lighting of area, courtyard – system lighting fittings
Low voltage wiring Systems entry phone (intercom) system

Structure

Foundations Reinforced concrete foundation slab
Structural walls and columns Walls and columns in the underground storey made of reinforced concrete, masonry in the part above the ground level
External nogging (filling) Walls masonry walls made of SILKA 24 silicate blocks, thermally insulated with light mineral wool, plastered with mineral pre-coloured plaster, stone slab facing on a part of walls
Walls between flats Masonry walls made of SILKA 24 silicate blocks, plastered on both sides with cement-lime plaster with putty coat
Partition walls of kitchens and bathrooms Masonry walls made of SILKA 8, 12 silicate blocks plastered on both sides with cement-lime plaster with putty coat
Partition walls Masonry walls made of SILKA 8, 12 silicate blocks plastered on both sides with cement-lime plaster with putty coat
Floor-ceilings cast Reinforced concrete
Balconies cast Reinforced concrete, finished with freezeproof tiles, painted steel railings
Flat roof, roof Flat roof over the staircase covered with thermoweldable membrane, steep roof covered with slate
Flat roof over the garage Green roof, grass, washed gravel on parts, water insulation based on thermoweldable membrane
Windows Glued windows made of pinewood, painted in grey colour, thermal insulation of 1.1 W/m2K
Shop windows Made of aluminium, profiles with thermal separator, glass set k<=1.1 W/m2K
Entrance Door in aluminium hardware system, entrance doors to premises

Hall of ground floor with vestibule, staircase, corridors

Floor slabs made of slate on glue - thickness of 2.0 m, graphite colour
Walls Plastered with cement-lime plaster with putty coat, wallpaper made of glass fibre, painted
Ceilings Plastered with cement-lime plaster with putty coat, suspended ceilings made of gypsum boards on a part of it
Windows Glued windows made of pinewood, painted in grey colour, thermal insulation of 1.1 W/m2K and aluminium profiles with thermal separator, glass set k<=1.1 W/m2K
Central heating system Steel panel radiators on the ground floor with thermostatic valves
Wiring systems Internal lighting
Low voltage wiring systems Entry phone (intercom) system
Equipment Letter boxes in the vestibule
Railings Steel railings painted in grey colour according to Ral 7035 with wooden hand-rails
Flights of stairs and staircase landings Made of reinforced concrete, floor made of slate on glue - thickness of 2.0 m, graphite colour
Lift Passenger-goods lift without engine room, electric drive – MonoSpace from KONE, floor in the lift the same as in halls. Doors at stops made of steel, powder painted in grey colour according to Ral 7035

Leisure rooms in the underground storey

Floor Ceramic tiles in Mini Spa, wooden parquet floor in gym
Walls Plastered with cement-lime plaster, painted, wainscot made of ceramic tiles
Ceiling Plastered with cement-lime plaster, painted, suspended ceilings made of gypsum boards on a part of it, designed for wet rooms
Windows Glued windows made of pinewood, painted in grey colour, thermal insulation of 1.1 W/m2K
Sanitary systems Electric heaters, toilets near cloakrooms
Wiring systems Floor heating in Mini Spa room, lighting system
Equipment Bathtub with hydro massage, solarium, sauna with INFRARED cabin, two showers with hydro massage, deckchairs, equipment for exercising such as a bike, a treadmill

Dustbin room

Floor Concrete floor with a slope towards outside
Walls Built from silicate SILKA 24 blocks, plastered with mineral plaster
Ceiling Reinforced Concrete, not-plastered
Wiring systems Lighting inside the dustbin room
Door Steel door with filling made from steel net , painted in grey

Flats

Floor The entrance hall rooms wooden panels, bathroom and the parts at the kitchenettes – tiles, balconies and terraces - frost-resistant milled rock tiles
Wall In all rooms cement-limestone plaster with the gypsum finish, painted; balconies and terraces – mineral plaster coloured in mass according to the elevation colours
Ceiling In all the rooms cement - limestone plaster with gypsum coat, painted white
Windows Glued windows made of pine wood, open-out and hopper, painted grey, thermal insulation 1,1 W/m2K
Windowsills Wooden inside windowsills outside windowsills made of titanium – zinc sheet, painted grey according to RAL 7035
Door Anti-theft front door e.g. Made by PORTA, inside door made of wood - veneer front
Water and sewage installation In the apartment made of plastic pipes, laid in the floor layer, individual water meters, hot water from the flow double-function heater
Central heating installation in the bathrooms gas double-function heaters with closed combustion chamber; rooms: steel plate radiators Cosmo Nova produced by VNF company, in the bathrooms ladder radiator Cosmo Atr Standard of the same company Danfoss
Ventilation installation Living room with kitchen annex and the bathroom: gravity ventilation
Electrical installation Three – phase electrical installation for electric cooker, lighting installation
Low-voltage installations Data communications installation and cable TV installation, one socket in each room
Furnishings Video intercom in the hall

Garage

Floors Concrete reinforced floor with sub-crust coating, finished with epoxy resin, of dark grey colour
Walls Ferroconcrete walls painted with grey paint for concrete
Ceiling Ferroconcrete plate, painted, in the space under the building insulated mineral wool, plastered with cement – limestone plaster, painted grey
Water and sewage installation Fire hydrant, floor line drainage in ACO system
Ventilation installation Air blow through holes in outside walls and mechanical exhaust installation located in exhaust channel near staircase
Electrical installations Lighting installation
Low voltage installations Video intercom at the entrance to the staircase hall
Furnishings Garage door standard, produced by Hermann company, opened automatically